Visualisation: refurbished period building with balconies and red tiled roof

Approved

An apartment building in Lucerne is being transformed into furnished, age-friendly homes – step-free, energy-efficient and ready for an additional storey in future.

Key facts

Location
Lucerne LU
Status
Approved
Offer
Rental apartments
Use
Furnished, age-friendly rental homes
Scope
Core refurbishment with timber interior construction
Completion
Q1 2028
ELEVATE's role
Design and turnkey contracting
Homes
22
Energy
Heat pump with underfloor heating, external thermal insulation
Start of construction
Scheduled for January/February 2027
Client
Owners managed by crowdhouse

The project, Lucerne, Core refurbishment

At Luzernerstrasse 30 in Lucerne we are comprehensively renewing an apartment building to create furnished, age-friendly homes. The building will be stripped back to its floor slabs and stairwell and rebuilt inside using timber construction. The building permit is legally binding, and construction is scheduled to start in January or February 2027.

The building will gain external thermal insulation, new windows, a heat pump with underfloor heating and a lift. The homes are designed to be step-free – with parquet, slip-resistant ceramic tiles, fibre-optic internet and Wi-Fi, and a video intercom with a 24-hour emergency call service. A shared meeting space will be created in the garden.

The structure and building services are already prepared for an additional storey in future. ELEVATE is planning and delivering the project as turnkey contractor in partnership with crowdhouse.

Visualisation: bathroom with level-access shower and washing machine

Highlights

  • Step-free, furnished homes
  • Lift, fibre-optic internet and Wi-Fi in every home
  • Video intercom with 24-hour emergency call
  • Shared meeting space in the garden
  • Prepared for an additional storey

News on this project

Published on , Lucerne

Lucerne: building permit in place for Luzernerstrasse 30

The building permit for converting the apartment building at Luzernerstrasse 30 in Lucerne is now legally binding. Construction is scheduled to start in January or February 2027.

Next project

Neudorfstrasse 3 and 5

Menzingen, Core refurbishment, Completed

Next project: Neudorfstrasse 3 and 5